_ DEC-O-LOG for PMAG-DB _ DOL, PMAG-DB-F001, Low 3D Turbochannel Graphics Option, Jun 91 PROBLEM: There will NOT be any diagnostic failure. The system will run EXTREMELY slow with pauses between each character printed. FIELD EFFECTIVITY: All Turbochannel systems other than DS5000 Model 200 that will have a PMAG-DB graphics option (Low 3D) built prior to 5/24/91 installed in them. QUICK CHECK: Check the serial number on the PMAG-DB graphics option. If built in ABO prior to 5/24/91 or if built in AYR prior to 5/12/91, the FCO is needed. FCO KIT ORDERING EQ-01611-01 54-20185-01 PMAG-DB Option FA-04944-01 FCO Document